You need to be signed in to add your comment.

2025 Physical Environment

Efforts in 2024

  • Limited access points
    • Sections of fencing and gates were added to protect the creek and regulate the flow of creek users
  • Modified the beach layout
    • Improved the ability to observe users and limit large gatherings.
  • Widened the RV Park trail
    • Eliminated a bottle neck to allow pedestrians to flow more freely. Officers can now travel through the area on the UTV.
  • Outfitter Shuttles
    • 3,372 people purchased public shuttle tickets, with most taking two shuttle rides. 246% increase from last year. 70-75% of people who rented tubes from Adventure West (the only outfitter directly offering shuttles) rode shuttle vs. walking with their tubes.

2025 Proposed Efforts

  • Continue use of flaggers at Ford St.
  • Continue use of public shuttle
Share 2025 Physical Environment on Facebook Share 2025 Physical Environment on Twitter Share 2025 Physical Environment on Linkedin Email 2025 Physical Environment link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>